|
Mar 10, 2025
|
|
|
|
CE 4161 - Underground Construction and Trenchless Technology (3) Dual Listed as: CE 5161 Learning methods that can be applied to make deteriorating underground pipeline infrastructures more sustainable. Theory and practice of underground construction methods including trenchless construction and large tunneling technology. Types of equipment, roles of site personnel, engineering design, contractual issues, and safety
Prerequisite(s): CE 3101 and senior standing. Component(s): Lecture Contact Hour(s): 3 hours lecture/discussion. Grading Basis: Graded Only Repeat for Credit: May be taken only once Course Category: Major Course
Add to Portfolio (opens a new window)
|
|